Universal installation housing

Universal installation housing with mineral fibreboard cover

Universal installation housing with mineral fibreboard cover
Preview: Universal installation housing with mineral fibreboard cover
Universal installation housing with mineral fibreboard cover
  • 1297-22
  • 4013456490055
  • two-part, consisting of a rear housing and a front part with a mineral fibreboard insert
  • all-round groove indicates the maximum opening size
  • incl. internal support element to strengthen the housing
Length
250 mm
Width
220 mm
Depth
90 mm
Installation opening
200 x 145 mm
Device installation depth
65 mm
Ceiling thickness
≥ 140 mm
Wall thickness
≥ 120 mm
suitable for horizontal formwork
Yes
suitable for vertical formwork
Yes
Dispatch
5
Product information

Universal installation housing

Universal installation housing for the installation of almost all device types and shapes in concrete walls and ceilings. The housing system consists of nine different installation housings and an extensive range of accessories.

  • For displays, LED lights and much more
  • For installing almost all shapes and sizes
  • For installation in walls or ceilings
  • For in-situ or prefabricated concrete
  • For horizontal or vertical formwork and for masonry
  • for ceiling thicknesses of 140 mm and higher
  • for wall thicknesses of 120 mm and higher

Application example

The concreted-in housing with flush-mounted finish of the mineral fibreboard. The groove in the mineral fibreboard indicates the maximum installation area.

The support element in the installation housing prevents it being pressed inward during concreting.

When attaching the device to the installation housing, use only screws that go into but not right through the mineral fibreboard cover (e.g. SPAX countersunk head screw 3.5 x 15 mm)!

The front cover can be easily cut to create virtually any opening shape.

Note

The indicated wall thicknesses refer to walls without a fire protection function. The following applies to fire protection walls: Remaining wall thickness must be min. 60 mm. When using halogen lamps, pay attention to maximum power (see product details).

Certificates
Certificate

Concrete construction boxes - Sound insulation certificate

Download
Product data sheet

Universal installation housing with mineral fibreboard cover

Article no: 1297-22

Download
Brochure

Electrical installation in on-site mixed concrete and as part of the 3D concrete printing process.

Boxes, housings and systems.

55 MB | 2024-09-03

Brochure

Electrical installation in concrete construction precast concrete production and prefabricated room modules.

Boxes, housings and systems.

5.3 MB | 2024-02-28